Expansion • Space Conversion

Greenwood Basement Finish

A Greenwood basement converted from unfinished storage to a family room, bedroom, and full bathroom — permitted, waterproofed, and finished throughout.

Bright living area with cream sofa, woven lounge chairs, black ceiling fan, and wall-mounted mini-split

Overview

Location
Greenwood, Seattle
Timeline
6 weeks
Scope
Basement finish
Completed
May 2025

Highlights

  • 900 sq ft finished
  • Open family room
  • Permitted bedroom with egress
  • Full tile bathroom
  • Spray foam insulation
  • LVP flooring throughout
  • Completed in 6 weeks
Bright bedroom with gray upholstered bed, wide window, round gold mirror, and fiddle-leaf fig

We'd been using our basement as overflow storage for years and just couldn't see past it. Luke walked through it with us, pointed out what was possible with the ceiling height and egress options, and laid out a clear scope with no surprises. We went from concrete floor and exposed joists to a family room, bedroom, and full bath in six weeks.

Morgan W.

The Story

What the homeowner wanted

More living space for a growing family without moving out of Greenwood.

Our plan

Waterproof the basement, add egress for a legal bedroom, and finish the space as a family room, bedroom, and full bath.

Build steps (high level)

  1. Moisture and drainage assessment
  2. Framing and egress window installation
  3. Electrical and plumbing rough-in
  4. Insulation and drywall
  5. LVP flooring and tile bath
  6. Trim, paint, and fixtures

Results

  • 900 sq ft of livable space
  • Legal bedroom
  • Passed all inspections
Bathtub alcove with marble-look wall tile, recessed niche, and brushed-gold rain shower fixtures Teal bathroom vanity with brass faucet, round gold-framed mirror, and three-globe brass light Hallway view of bathroom with green vanity and round mirror, beside a front-load washer and dryer Bedroom with neutral bedding, mirrored sliding closet doors, wall-mounted mini-split, and wide window

Ready to saddle up?
Get a free estimate and consultation today.

What we did

Services performed on this job

Scope highlights:

Moisture control
Foundation waterproofing and vapor barrier before any finishing.
Egress window
Code-compliant egress for the below-grade bedroom.
Framing & insulation
Full stud walls with spray foam insulation throughout.
Tile bath
Full bathroom with tile shower and vanity.

Basement & Attic Conversions

Attics, basements, and underutilized rooms transformed into livable, functional space — permitted and finished properly.

View service